Ir directamente a la información del producto
UT SERIES · DISPONIBLE AHORA
Glow Bead Hook Rig with Long Leader, Barbed, Sizes 8–14
$1.82
Specifications
Product specifications
Available options
| Pack | 1 Set · 3 Sets · 5 Sets |
|---|---|
| Hook Size | No. 8 · No. 9 · No. 10 · No. 11 · No. 12 · No. 13 · No. 14 |
Product Details
| Leader Length | 7 cm |
|---|---|
| Features | Glow-in-the-dark beads, self-locking design |
| Hook Material | High-carbon steel |

Long Snell Flip Board Rig
- Features a 7 cm long leader for easy hook suction
- Equipped with glow-in-the-dark fish-attracting beads
- Self-locking design without space beans

Floating Hook Rig for Silver & Bighead Carp
- Features extended leader lines with luminous glow beads
- Designed for floating bait rigs targeting carp species

Anti-Tangle Rubber Sleeves
- High-quality rubber tubing encapsulates the leader line for superior anti-tangle protection

High-Carbon Steel Hooks
- Hand-bound snell leader
- High tensile strength and rust-resistant
- Reusable construction
- High-carbon steel hook design

- Glow beads (luminous beads)

Hook Installation Diagram
- This product includes hooks only; other accessories are not included.

Installation Method
- Step 1: Thread through 1 or 2 bait blocks.
- Step 2: Remove the main line from the second hook cluster and thread through again.
- Step 3: Thread the sinker plate, snap the connector, and tie to the main line.
- Step 4: Installation complete.


