Ir directamente a la información del producto
UT SERIES · DISPONIBLE AHORA
Long Lead Jig, Fast Sinking, 80–100 g (2.8–3.5 oz)
$6.40
Specifications
Product specifications
Available options
| Color | Silver · Pink |
|---|---|
| Weight | 80 g (2.8 oz) · 100 g (3.5 oz) |
| Length | 19.8 cm (7.8 in) · 21.5 cm (8.5 in) |
Product Details
| Weight | 100g |
|---|


- Iridescent metallic long knife-style metal jigs with 3D eyes
- Printed weight mark: 100g


Luminous Glow Metal Jigs
- High-reflectivity holographic laser finish
- Glow-in-the-dark striped pattern for deep water visibility
- 3D lifelike fish eyes for enhanced attraction
