Skip to product information
UT SERIES · AVAILABLE NOW
Double-Ring Long Lead Sinkers, 0.7–3.5 oz (20–100 g)
$17.08
Specifications
Product specifications
Available options
| Weight | 0.7 oz (20 g) · 1.1 oz (30 g) · 1.4 oz (40 g) · 1.8 oz (50 g) · 2.1 oz (60 g) · 2.5 oz (70 g) · 2.8 oz (80 g) · 3.2 oz (90 g) · 3.5 oz (100 g) |
|---|---|
| Pack | 75 pcs, 3.3 lb (1.5 kg) · 125 pcs, 5.5 lb (2.5 kg) · 50 pcs, 3.3 lb (1.5 kg) · 83 pcs, 5.5 lb (2.5 kg) · 38 pcs, 3.3 lb (1.5 kg) · 62 pcs, 5.5 lb (2.5 kg) · 30 pcs, 3.3 lb (1.5 kg) · 50 pcs, 5.5 lb (2.5 kg) · 25 pcs, 3.3 lb (1.5 kg) · 42 pcs, 5.5 lb (2.5 kg) · 21 pcs, 3.3 lb (1.5 kg) · 36 pcs, 5.5 lb (2.5 kg) · 19 pcs, 3.3 lb (1.5 kg) · 32 pcs, 5.5 lb (2.5 kg) · 17 pcs, 3.3 lb (1.5 kg) · 28 pcs, 5.5 lb (2.5 kg) · 15 pcs, 3.3 lb (1.5 kg) · 25 pcs, 5.5 lb (2.5 kg) |
Product Details
| Material | Pure lead, 304 stainless steel |
|---|---|
| Features | Integrated ring design to prevent detachment |
Product Parameters
| Weight | 20g | 30g | 50g | 60g | 70g | 80g | 100g |
|---|---|---|---|---|---|---|---|
| Length | 60mm | 67mm | 77mm | 82mm | 87mm | 90mm | 95mm |
| Diameter | 9mm | 10mm | 11mm | 12mm | 14mm | 14mm | 15mm |
Data is measured manually; please allow a 1–2 cm error margin.

- Made of pure lead with a 304 stainless steel integrated ring to prevent detachment
- Suitable for various fishing scenarios and techniques

Double-Ring Lead Sinkers
- Pure electrolytic lead
- Clear weight markings
- Fast water-cutting design
Product Parameters
- Data is measured manually, please allow 1-2 cm error margin.

Heavy-Duty Metal Hanging Ring
- Heavy-wire metal ring with high tensile strength

Clear Markings for Easy Selection
- Integrated machine die-casting ensures clear, easy-to-read weight scale markings.

Pure Electrolytic Lead Sinker
- Made of pure electrolytic lead material, eco-friendly and pollution-free.