Skip to product information
Long Lead Jig, Fast Sinking, 80–100 g (2.8–3.5 oz) – option photo

UT SERIES · AVAILABLE NOW

Long Lead Jig, Fast Sinking, 80–100 g (2.8–3.5 oz)

$6.40
Color
Weight
Length
Specifications

Product specifications

Available options

Color Silver · Pink
Weight 80 g (2.8 oz) · 100 g (3.5 oz)
Length 19.8 cm (7.8 in) · 21.5 cm (8.5 in)

Product Details

Weight 100g

  • Iridescent metallic long knife-style metal jigs with 3D eyes
  • Printed weight mark: 100g

Luminous Glow Metal Jigs

  • High-reflectivity holographic laser finish
  • Glow-in-the-dark striped pattern for deep water visibility
  • 3D lifelike fish eyes for enhanced attraction